Phase I Environmental Site Assessment in Harrison, NJ

Harrison packs one of New Jersey’s densest concentrations of former heavy-industrial land into 1.2 square miles, sitting on the tidal Passaic River directly across from Newark with Interstate 280 running through the center of town and Route 7, the New Jersey Turnpike, and the Harrison PATH station at its edges. Property owners, developers, contractors, municipalities, and counsel working across West Hudson and the lower Passaic corridor rely on focused, locally informed environmental due diligence. Resource Renewal supports these projects through RCC’s ASTM E1527-21 Phase I Environmental Site Assessment scope, layered with NJDEP-compliant Preliminary Assessments to deliver both federal and New Jersey innocent purchaser protections.

Resource Renewal connects three service tracks under one platform: ASTM E1527-21 Phase I ESAs and NJDEP Preliminary Assessments delivered by RCC; Phase II Site Investigations and Remedial Investigations when Recognized Environmental Conditions are identified; and full remediation and brownfield redevelopment delivered with our affiliated platform DSR. Project teams coordinate with the NJDEP Site Remediation Program and pursue site closure under LSRP oversight toward a Response Action Outcome (RAO).

Why Property Owners and Developers in Hudson County Choose Resource Renewal

Resource Renewal’s headquarters at 10 Lippincott Lane sits inside the Resource Renewal Business Park, a completed brownfield redevelopment project, and a working proof point for the methodology RCC and DSR apply to client sites across Hudson County and the West Hudson industrial corridor.

  • ASTM E1527-21 Phase I ESA
  • NJDEP Preliminary Assessment overlay
  • Phase II Site Investigation
  • Soil & groundwater investigation
  • LSRP-led NJDEP closure pursuit
  • Brownfield redevelopment via DSR
  • Active project work in 5 states
  • 30+ years of NJ project history

Environmental Context in Harrison and Hudson County

Industrial and Commercial Heritage

Harrison was incorporated in 1840 and reincorporated as a town in 1869, and it adopted the motto “Beehive of Industry” in 1912 — at its peak the factories packed into the town’s 1.2 square miles employed as many as 90,000 people. Edison Lamp Works, later absorbed into General Electric, the RCA electron tube works, Crucible Steel, Otis Elevator, Worthington Pump and Machinery, Hyatt Roller Bearing, Harrison Alloys, Hartz Mountain, Remco Industries, and the Peter Hauck brewery all operated within walking distance of the Passaic riverfront and the rail lines feeding it. That density drives Phase I ESA recommendations today, with former plating and metal-finishing shops, alloy and foundry operations, machine shops, bulk fuel storage, and rail sidings recurring throughout the redevelopment area south of Interstate 280.

Current Environmental Profile

NJDEP Site Remediation Program records show a dense cluster of active and closed remediation cases across Harrison, East Newark, and Kearny. Common contaminants in this corridor include heavy metals — chromium, nickel, lead, and cadmium — from steel, alloy, and plating operations, chlorinated solvents (PCE, TCE) from metal finishing, electronics, and dry cleaning, petroleum hydrocarbons (TPH, BTEX) from former bulk fuel storage, rail fueling, and underground storage tanks, and PAHs and coal tar bound up in the historic fill placed across much of the riverfront. Soil vapor intrusion is the dominant Phase II driver in Harrison, where mid- and high-rise residential buildings are being constructed directly on former manufacturing parcels. PFAS investigation is now a standard Phase II component near former plating shops, fire training areas, and bulk storage sites along the Passaic.

Real Estate and Development Market

Harrison declared a 250-acre area between its Passaic River waterfront and Interstate 280 in need of redevelopment in 1997 — roughly a third of the entire town — and that plan is still generating transactions. Nearly 3,000 residential units have been delivered across Harrison Station, Harrison Urby, Vermella Harrison, Water’s Edge, Riverpark, One Harrison, and the CoBalt Lofts and Steel Works phases of the Riverbend District, alongside the 25,000-seat soccer stadium that opened in 2010 and the $256 million rebuild of the Harrison PATH station. Redevelopment of the Riverbend parcels alone required demolition of the standing industrial buildings and removal of roughly 50,000 cubic yards of contaminated soil. Remaining large-parcel warehouse and industrial holdings north and east of the redevelopment area keep Phase I ESA and Phase II volume steady across Harrison, East Newark, and Kearny.

Local Regulators, Authorities, and Stakeholders

The NJDEP Northern Regional Office in Mahwah provides SRP oversight for Hudson County. Routine touchpoints during Phase II and remedial action work include the Harrison Redevelopment Agency, the Harrison Planning Board and Zoning Board of Adjustment, the town engineer, the Hudson County Division of Planning, and the Hudson County Improvement Authority. Because most of the redevelopment area sits inside the 100-year floodplain, projects frequently involve the NJDEP Division of Land Resource Protection on flood hazard area and waterfront development permits, and coordinate with the US Army Corps of Engineers on the Passaic River Tidal Flood Control Project and with the town’s Municipal Public Access Plan for the riverfront walkway. Sites fronting the tidal Passaic also require attention to the Diamond Alkali Superfund sediment program, and NJ TRANSIT, PATH, and freight rail easements are common on rail-adjacent parcels.

Why This Local Context Matters for Your Project

Local industrial history, the current contaminant profile, regulator office assignments, and the pace of waterfront redevelopment transactions all feed directly into Phase I scoping decisions and downstream remediation planning. Three decades of project work across North Jersey mean RCC crews already know the NJDEP Northern Regional Office, the typical AOC profiles encountered in Harrison — historic fill, metals from alloy and plating operations, residual petroleum, soil vapor intrusion, and floodplain constraints — and the surrounding parcels that recur in historical use research. That institutional familiarity shortens timelines and sharpens the recommendations delivered in each report.

Environmental Services Available to Harrison, NJ Projects

Service availability spans two connected tracks: Investigation & Compliance, including transactions, financing, and regulatory closure documentation, and Remediation & Redevelopment, including physical cleanup, environmental liability transfer, and conversion of impaired real estate. RCC and DSR jointly cover the full project lifecycle from pre-acquisition due diligence through final regulatory closure and redevelopment.

RCC investigation track Compliance DSR redevelopment track

How Resource Renewal Serves Harrison, NJ

Investigation & Compliance (RCC Track)

The ASTM E1527-21 Phase I ESA scope covers site reconnaissance, historical land use review, regulatory database searches, agency file reviews, and key personnel interviews. RCC layers the federal ASTM scope with an NJDEP-compliant Preliminary Assessment so projects carry both federal CERCLA and NJ ISRA innocent purchaser protections. When Recognized Environmental Conditions or Areas of Concern are identified, RCC moves directly into Phase II Site Investigation and, where warranted, Remedial Investigation — coordinating sampling plans, certified laboratory analysis, and data evaluation under NJDEP Site Remediation Program Tech Rules. Documentation is built for NJDEP review and LSRP certification.

Remediation & Redevelopment (DSR-Affiliated Track)

Remediation capabilities include in-situ chemical oxidation, bioremediation, soil vapor extraction, ex-situ excavation and disposal, groundwater pump-and-treat systems, permeable reactive barriers, sub-slab depressurization, and long-term operations, maintenance, and monitoring (OM&M). For owners exiting impaired property, the DSR platform provides brownfield acquisition, environmental liability transfer, and full redevelopment, applied across more than 100 brownfield sites in NJ, NY, PA, MA, and OH. The Mount Holly HQ at the Resource Renewal Business Park is itself a representative example of a former brownfield converted into productive operating real estate.

Frequently Asked Questions

Visit Our Mount Holly, NJ HQ or Find Us Near You

The Resource Renewal Business Park

10 Lippincott Lane, Unit 1
Mount Holly, NJ 08060

For ASTM E1527-21 Phase I ESA, Phase II Site Investigation, remediation, regulatory compliance, or brownfield redevelopment support on a Harrison, NJ project, contact Resource Renewal directly. Project work in New Jersey is delivered under LSRP oversight, with field crews mobilizing from our Mount Holly HQ. Call (856) 273-1009 or request a project consultation.

Contact Resource Renewal for Project Support